Upon the arrival of the Roxul mineral wool insulation for sub slab, the contractor relaid the Stego vapor barrier (taped to edges at perimeter).  This delay actually may have been a good thing, as the mineral wool was protected from the elements and heavy foot traffic and slab was able to be immediately poured. slab pour
The framing of the second floor and roof are nearing completion.  We are using 2×6 structural walls with 3/4″ plywood sheathing, all edges and corners taped and sealed.  The headers above each opening are two TJIs with Roxul mineral wool sandwiched between them – we have insulated headers!  The lead carpenter did not find it to be time consuming or of any issue, but rather thought it was pretty cool and a no-brainer.
The fireplace is a Rumford fireplace, the most efficient design in providing warmth to a space.
roof and fireplace

November 5, 2014

framing 2
And suddenly…it’s a house.  The trusses arrived and were set at 24″ on center on top of our 24″ on center 2×6 structural wall on top of our 24″ on center MSR 2×10 floor framing on top of our basement wall.  Walking through the skeleton to see the clean, aligned bones was really exciting.  Our framers did a fabulous job with advanced framing and aligning all the structure.  It sounds simple and straightforward, but I’ve walked in many that seem junked up with unnecessary studs and multiple upon multiple jacks and kings.
framing 1
The blue line along the top plate is Tescon Vana magic tape sealing the corner edge of our plywood air barrier. Each spliced top plate is taped as well.