December 14, 2011
December 14, 2011
December 6, 2011
Earlier in the fall we had a beautiful landscape plan drawn up by our colleague Jeff Plusen of Plusen Designs. The plan incorporated native plantings, reuse of material, rainwater capture and clean architectural lines.
The landscaping will be done in phases, with the first phase being clearing. The yard had not been maintained for years. many years. A lot of work went into clearing and it was exciting to see the yard be uncovered.
An extended brick patio was found as well as a height difference of roughly 14" from the brick patio to the yard. Several large pieces of granite were also discovered and used as a mini retaining wall for this change in height. Though this discovery alters the original concept a bit, we will adhere to it as much as possible.
To get us through to Spring, grass was planted in the 'lawn' and the beds were mulched. Phase II will be installing the native plants, followed by future Phases to rework the brick patio, and install the water feature/rain capturing system.
Until then, we are extremely excited to look out to a lovely, CLEAN yard and cannot wait for the nesting birds of Spring, flowers blooming and enjoying tea out on the patio! An additional thank you to Jeff Plusen for providing a great design.
December 1, 2011
Please join us for our First Friday Midnight Madness celebration in Ellicott City! This Friday also celebrates the beginning of the holiday season. Ellicott City will be decked out in lights and bells, music and santas! Brennan + Company and alterego will be hanging out on our new front porch selling bamboo cutting boards and handing out yummy treats. Spend your Friday night in quaint Ellicott City and stop by and see us in our new space.
November 8, 2011
November 7, 2011
First, a huge apology to all friends, clients and potential friends and clients for disappearing from the communications world for 10 days. Due to some unavoidable mishaps with various service providers, I will mention no names, we have finally resumed communication with the outside world. So please, we are still here, try us now.
As we begin the second week in our new space and witness the end result of months of drawing, coordination and construction, we come away with lessons learned and a beautiful demonstration space. There are still small things to be completed such as getting a mailbox, waiting on the installation of some light fixtures, and having the courtyard cleared and planted. But nonetheless we find ourselves in a comfortable, well-lit space with no evil 'new smell' fumes.
Drop by for a visit!
October 26, 2011
tomorrow morning we will be unlocking the door to our new ellicott city office space! today is moving day. i sit with my computer amongst a few scattered boxes, leftover desks and the emptiness of our temporary basement office. i look forward to a quiet space, operable windows and a garden view in which to contemplate the meaning of architecture.
our new address: 8333 Main Street, second floor, Ellicott City, MD 21043 – stop by for a visit!
October 24, 2011
October 11, 2011
As part of the renovation, we added substantial insulation to the second floor shed roof space, which will ultimately be our working studio.
The existing roof structure was 2×4 framing! We filled that with Johns Manville, formaldehyde-free blown-in fiberglass batts and on top of the roof structure added 3 1/2" of polyiso insulation.
We also added (3) Velux sun tunnels for added daylight to the studio and showroom space. The photo above shows the sun tunnel cut through the 3 1/2" of polyiso.
We placed a new reflective white roof on these shed roof spaces, which were originally black tar.
all in all, we've achieved a R-value of 35.4 plus the reflective roof. not bad for a 171 year old building!
Having achieved at least a 60% energy use reduction, we were able to reduce our equipment sizes and replace outdated and non-existent units with new, smaller, high-efficiency ones.
The project incorporates a 96% efficient Buderus Condensing Gas Boiler for radiant baseboard heat throughout the building. The system has three zones for the three leasable spaces.
baseboard heat….
For cooling, each leasable space will have a 1 TON mini-split system by Fujitsu. Wiring and tubing for unit is shown in photo.